A physically based boiler model is developed to solve a set of optimization problems. The model evaluates the normal operation of a 235 MW gas/oil boiler. The model has 7 states in the process and 25 states in the control system. The boiler has a two stage superheater, a single stage reheater and an economizer. The designed steam pressure is 1815 psia with both superheat and reheat temperatures of 1000 deg F. The model is used to solve the optimal set-point scheduling problem in the boiler system. This paper discusses the boiler process state space model.
Get full access to this article
View all access options for this article.
References
1.
Bailey, J.M. and Pierce, G.F.1975. "Modeling of operating fossil fired power plants: An application approach." In Proc. of the 2nd. Power Plant Dynamics, Control and Testing Symposium. Knoxville, Tenn. September 1975.
2.
Dieck-Assad, G., Masada, G., and Flako, R.H.1987. "Optimal Set-Point Scheduling in a Boiler-Turbine System ," IEEE Transactions on Energy Conversion, EC-2, No. 3, (September): 388-395.
3.
Masada, G.1979. ''Modeling and Control of a Power Plant Boiler-Turbine-Generator Systems." Ph.D. Thesis, MIT,1979.
4.
McDonald, J.P. and Kwatny, H.1973. "Design and Analysis of Boiler-Turbine-Generator Controls using the Optimum Linear Regulator Theory," IEEE Transactions on Automatic Control, AC-18, No. 3, (June): 122-127.
5.
McDonald, J.P. and Spare, K.1971. "A Nonlinear Model for Reheat Boiler Turbine Generator Systems." In JACC Proceedings, Part I and Part II, (November): 219-236.
6.
Noton, D. and Markland, J.1967. "Numerical Computation of Optimal Control." IEEE Transactions on Automatic Control, AC-12, No. 1, (February): 24-32.
7.
Pena, R.1983. "A Large Scale Power Plant Model For Simulation and Control ." Doctoral Dissertation, The University Of Texas At Austin, December1983.
8.
Speedy, C.B. and Dyer, R.1967. ''Modeling a Steam Generator For Computer Control," In Proceedings of the IFAC Symposium on Automatic Control , September 1967.