Enright, B.Selection for Survival; A Review of Acquisition and Retention Policies. British Library, 1989.
2.
For example. Lee, S. H. (ed.). Acquisition, Budgets and Material Costs: Issues and Approaches. Haworth, 1987.
3.
See for example the group of articles in: Serials Librarian , 1986-1988, 12-14.
4.
Department of Industry. Committee for Terotechnology. Life Cycle Costing in the Management of Assets: A Practical Guide. HMSO, 1977.
5.
Wubbenhorst, K.L. "Life Cycle Costing for Construction Projects." Long Range Planning19 (4): 87-97 (1986).
6.
Neale, C.W. and G. Wagstaff. "Discounted Cash Flow and Life Cycle Costing for Construction Projects." International Journal of Operations and Production Management5 (4): 55-70 (1985).
7.
Taylor, W.B. "The Use of Life Cycle Costing in Aequiring Physical Assets." Long Range Planning, 14 (6): 32-43 (1981).
8.
Great Britain, Defence Committee. The Procurement of Major Military Defence Equipment: Fifth Report of the Defence Committee, Session 1987-88. HMSO, 1988.
9.
Clements, D. "Preservation Decision Making in Serials Management; Policies for Collection and Retention (Paper presented to the Managing the Preservation of Serials Literature conference held in Washington DC, 1989).