BartonN, LienR, LundeJ.1974. Engineering classification of rock masses for the design of rock support, Rock Mech., 6, (4), 189–236.
2.
BawdenWF. 1993. The use of rock mechanics principles in Canadian hard rock mine design, in Comprehensive rock engineering: principles practice and projects, (ed. , HudsonJ A), 347–290; Oxford, Pergamon Press.
3.
CaceresCAB. 2005. Effect of delayed backfill on open stope mining methods, MSc thesis, University of British Columbia, Vancouver, BC, Canada.
4.
ClarkLM. 1998. Minimizing dilution in open stope mining with focus on stope design and narrow vein longhole blasting, MSc thesis, University of British Columbia, Vancouver, BC, Canada.
5.
ClarkLM, PakalnisRC. 1997. An empirical approach for estimating unplanned dilution from open stope hangingwalls and footwalls, Proc. 99th CIM Annu. General Meet., Vancouver, BC, Canada, April 1997,CIM, Paper #TAM1-A01, 33.
6.
CristescuND, HunscheU.1998. Time effects in rock mechanics; Chichester, New York, John Wiley & Sons.
7.
DaemenJJK. , FuenkajornK, Phien-wejN2009. On the importance, and difficulty, of dealing with the time dependency of engineered structures in, on, or with hard rock, in Rock mechanics, (ed., ed), 3–34; Pataya, Suranaree University of Technology.
8.
DiederichsMS, KaiserPK. 1996. Rock instability and risk analyses in open stope mine design, Can. Geotech. J., 33, 431–439.
9.
DominySC, AnnelsA, CammGS, WheelerP, BarrSP. 1999. Geology in the resource and reserve estimation of narrow vein deposits, Explor. Geol., 6, (4), 317–333.
10.
DominySC, CammGS. 1996. The nature and exploitation of narrow tin veins: a case study from South Crofty mine, Cornwall, U. K., Brit. Min., 57, 150–170.
11.
Bay Mining LtdEcho, PakalnisRC and Associates. 1998. Development of stope design guidelines for narrow vein open stope mining in terms of minimizing dilution, CANMET project no. 5-1228, Ottawa.
12.
GermainP, HadjigeorgiouJ, LesardJF. 1996. On the relationship between stability prediction and observed stope overbreak, Proc. 2nd North Am. Rock Mech. Symp., Montreal, Que, Canada, NARMS, 227–283June 1996,
13.
HadjigeorgiouJ, LeclaireJ, PotvinY.1995. An update of the stability graph method of open stope design, Proc. 97th CIM Annu. General Meet., Halifax, NS, Canada, May 1995, CIM, 157–161.
LizotteYC. 1993. Narrow vein blasthole stoping: current drilling and blasting technology, Project report to the Canada Northwest Territories Mineral Development Agreement, Ottawa.
16.
LøsetF.1999. Use of the Q-system in weak rock masses, NGI report no. 592048-1, NGI, Oslo, Norway.
17.
MartinCD. 1997. Seventeenth Canadian geotechnical colloquium: the effect of cohesion loss and stress path on brittle rock strength, Can. Geotech. J., 34, 698–725.
18.
MathewsKE, HoekE, WyllieDC, StewartSBV. 1981. Prediction of stable excavation spans at depths below 1000 m in hard rock mines, Report to CANMET, DSS serial no. OSQ80-00081, DSS, Vancouver, BC, Canada.
19.
MawdesleyC, TruemanR, WhitenW.2001. Extending the Mathews stability graph for open-stope design, Trans. Inst. Min. Metall. A, 110, A27–A39.
20.
NicksonSD. 1992. Cable support guidelines for underground hard rock mine operations, MSc thesis, University of British Columbia, Vancouver, BC, Canada.
21.
PalmströmA.1982. The volumetric joint count – a useful and simple measure of the degree of rock mass jointing, Proc. IAEG Con, V.221–V.228; New Delhi, IAEG.
22.
PotvinY.1988. Empirical open stope design in Canada, PhD thesis, University of British Columbia, Vancouver, BC, Canada.
23.
PotvinY, MilneD., KaiserP K, McCreathD R1992. Empirical cable bolt support design, in Rock support, (ed., ed), 269–275; Rotterdam, A.A., Balkema.
24.
QuesnelWJF, LeyGMM. 1991. The development of mine design guidelines for dilution control, Bousque Div., no. 1 Shaft, Lac Minerals, Ltd, Proc. 93rd CIM Annu. General Meet., Vancouver, BC, Canada, April 1991, CIM, 12.
25.
RanJ.2002. Hanging wall sloughing mechanism in open stope mining, CIM Bull., 95, 74–77.
26.
ReschkeAE, RomanowskiJ.1993. The success and limitations of Mathews analysis for open stope design at HBMS, Flin Flon operations, Proc. 95th CIM Annu. General Meet., 13; Calgary, Alta, CIM.
27.
StewartPC, TruemanR.2001. The extended Mathews stability graph: quantifying case history requirements and site specific effects, Proc. Int. Symp. on ‘Mining techniques of narrow vein deposits’, 85–92; Val'dor, Que, CIM.
28.
StewartPC, TruemanR.2003. Applying the extended Mathews stability graph: Quantifying case history requirements and site-specific effects, Proc. 1st AGCM Conf., Sydney, Australia, November 2003, AGCM, 55–61.
29.
StewartSBV, ForsythWW. 1995. The Mathews method for open stope design, CIM Bull., 88, 45–53.
30.
SuorineniFT. 1998. Effects of faults and stress on open stope design, PhD thesis, University of Waterloo, Waterloo, Ont., Canada.
31.
SuorineniFT. 2010. The stability graph after three decades in use: experiences and the way forward, Int. J. Min. Reclam. Environ., 24, (4), 307–339.
32.
SuorineniFT, KaiserPK2002Dependence of stand-up time of stopes on size and rock qualityProc. 5th North Am. Rock Mech. Symp. and 17th Tunnel. Assoc. Can. Conf.(, HammahR, ), 133–140; Toronto, Ont., University of Toronto Press.
33.
SuorineniFT, HenningJG, KaiserPK. 2001a. Narrow-vein mining experiences at Ashanti: case study, Proc. Int. Symp. on ‘Mining techniques of narrow-vein deposits’, Val'dor, Que., Canada, October 2001, CIM, 57–62.
34.
SuorineniFT, HenningJG, KaiserPK. 2008. Safe rapid drifting – support selection, Tunnel. Underground Space Technol., 23, 682–699.
35.
SuorineniFT, TannantDD, KaiserPK. 1999a. Determination of fault-related sloughage in open stopes, Int. J. Rock Mech. Min. Sci., 36, 891–906.
36.
SuorineniFT, TannantDD, KaiserPK. 1999b. Fault factor for the stability graph method of open-stope design, Trans. Inst. Min. Metall. A, 108, A92–A104.
37.
SuorineniFT, TannantDD, KaiserPK, DusseaultMB. 2001b. Incorporation of a fault factor into the stability graph method: Kidd mine case studies, Miner. Res. Eng., 10, 3–37.
38.
TatmanCR. , HustrulidW A, BullockR L2001. Mining dilution in moderate to narrow width deposits, in Underground mining methods – engineering fundamentals and international case studies, (ed., ed), Chap. 70, 615–626; Littelton, CO, SME.